IoT Consulting

Predictive maintenance: how to spot a failure before the alarm goes off

A temperature that rises one degree a day without leaving its range triggers no alarm. The trend tells you. How to read it and what it takes to get an alert.

Rubén MorenoManaging Director at engapplicPublished 6 min readLeer en español
In short: an alarm goes off when a value crosses its limit. Predictive maintenance watches how the value moves before it gets there, and can warn you days ahead so you plan the visit instead of chasing a breakdown.

The alarm comes too late

A machine’s alarms are designed to protect it: when a motor goes above 80 °C, it stops. That is the right behaviour, but by then the failure is already here, and the technician is racing to site.

What the alarm cannot see is the path to that limit. And that path is almost always in data the PLC already has.

What a trend looks like

A motor that usually runs at around 60 °C, with the alarm set at 80 °C, records these temperatures on consecutive days:

Alarm · 80 °CNormal · 60 °C70717273 °C≈ 7 days
Illustrative example: no alarm has gone off, but the trend will cross 80 °C within a week.

No single value is out of range. Looked at day by day, nobody notices. On a chart, it is obvious at a glance.

The alarm tells you it has already happened. The trend tells you it is going to happen.

What you need

  • The machine’s data, stored. Temperatures, consumption, pressures: whatever the PLC already measures.
  • To see it over time, not just the current value: a chart per signal and a dashboard per machine.
  • A rule that watches the trend and warns you before the limit.
AlarmPredictive maintenance
What it watchesThe current valueHow the value moves
When it warnsWhen the limit is crossedEarlier, with margin
What you doRepair the stoppagePlan the visit

Where to start

We start with a short, fixed-price consultancy: you tell us what you want to achieve and what your machine has, and we work out which signals matter. Behind it is coppioT, our no-code industrial IoT platform, which connects the PLC without redesigning the machine.

Rubén Moreno

Managing Director at engapplic. Industrial Electronics and Automation engineer (UPC); has been programming machines with Siemens and Beckhoff for over ten years.

Could your machine warn you before it stops?

15 minutes to look at it with your case.

Let's talk, 15 min →